Asphalt pavement of the runway continues.
Asphalt pavemen...
Detail Download
 Pavement works extend into the second kilometer of the runway.
Pavement works...
Detail Download
The top of Mc Connie Yammie Hill is flattened.
The top of Mc C...
Detail Download
 The Cargo Apron is being prepared for casting.
The Cargo Apro...
Detail Download
Returning Nationals SVG donate EC $35 000 to the AIA Contributory Fund.
Returning Natio...
Detail Download
Some of the members of the Returning Nationals SVG who attended the handing over ceremony at the GG\'s Residence this morning.
Some of the mem...
Detail Download
The final two rows of culverts are nearly to the 1000 ft length.
The final two r...
Detail Download
These guys are tightening the bolts of this corrugated steel culvert row.
These guys are ...
Detail Download
An elevated view of the assembling of the remaining two rows of corrugated steel culvert rows as at 13th May 2015.
An elevated vie...
Detail Download
Some members of the Royal St.Vincent and the Grenadines Coast Guard viewed the site earlier today.
Some members of...
Detail Download
View of the Northern end of the construction as at 13th May 2015
View of the Nor...
Detail Download
Filling and compaction of stones continue at the reclamation site toward the Northern end of the AIA construction.
Filling and com...
Detail Download
The footing for the Cargo terminal is currently being prepared.
The footing for...
Detail Download
Section where the first layer of asphalt has been laid thus far.
Section where t...
Detail Download
Meanwhile final base aggregate is laid ahead of asphalt pavement.
Meanwhile final...
Detail Download
The back wall at the terminal parking lot continues to be constructed.
The back wall a...
Detail Download
Thus far pavement of this first layer of Asphalt is 8 cm thick and is within the second km of the strip
Thus far paveme...
Detail Download
The final base aggregate and protective oil base have been laid ahead of Asphalt pavement.
The final base ...
Detail Download
A view of the second km of the project as at May 13th 2015.
A view of the s...
Detail Download
Closer view of the back wall construction at the terminal parking lot.
Closer view of ...