The General Aviation Apron continues to be paved.
The General Avi...
Detail Download
View of the Northern end of the project where more filling and compaction has been done at the reclamation zone.
View of the Nor...
Detail Download
Culverts have been assembled up to the mid length of the river spanning.
Culverts have b...
Detail Download
A small section of the base and foundation is left to be cast at the Yambou River spanning while the culverts are assembled from the other end.
A small section...
Detail Download
Close up of one of the corrugated steel culverts.
Close up of one...
Detail Download
One other angle of the assembling of the corrugated steel for the Yambou River Spanning.
One other angle...
Detail Download
View of the corrugated steel culverts.
View of the cor...
Detail Download
The assembling process of the river spanning as at 1st April 2015.
The assembling ...
Detail Download
The Pavement of the General Aviation Apron as at 1st April 2015.
The Pavement of...
Detail Download
The Yambou River spanning as at the 8th April 2015.
The Yambou Rive...
Detail Download
Box culverts are being installed at the parking lot of the terminal building.
Box culverts ar...
Detail Download
CEO of the IADC Dr. Rudolph Matthias not only toured His excellency Arreaza but also interviewed him.
CEO of the IADC...
Detail Download
From the left to right: Vice President of Venezuela His Excellency Jorge Arreaza , CEO of the IADC Dr. Rudolph Matthias and the VP\'s wife, Rosa Chavez. The couple and a delegation of bodyguards, assistants and press came to see how the project was ma
From the left t...
Detail Download
These guys are apart of the team who are installing box culvert drainage at the parking lot.
These guys are ...
Detail Download
Photo shows the Western most side of the project.
Photo shows the...
Detail Download
View of the pavement works at the Apron as at 8th April 2015.
View of the pav...
Detail Download
His excellency Jorge Arreaza and wife Rosa Chavez views the airport construction from the Control tower.
His excellency ...
Detail Download
In the first km 600 meters of runway have been laid with a protective layer.
In the first km...
Detail Download
The Yambou River spanning as at 15th April 2015.
The Yambou Rive...
Detail Download
View of the Northern end of the runway.
View of the Nor...
Detail Download
 
 